Container Tracker
Company: Airgas Industries Pvt Ltd
AS

Extraction Entry

Phase 1 · decant bulk gas into cylinders, dewars and silos

1 · Source container & purchase receipt

Opening in container
2,730 Cum
Max per extraction
3,990 Cum
Must remain (heel)
210 Cum
Safely extractable now
2,520 Cum
Helium ISO Container · Helium - 99.999%: keep 210 Cum inside so the vessel stays cold. Extraction happens in phases — each phase posts its own stock entry against .

2 · Receiving containers (0)

Scan the empty cylinders, dewars or silos receiving this phase.
44 empty containers are fit for filling today (2026-08-24). Hydro-test-overdue and damaged containers are hidden.

Extraction summary

Phase#1
Opening2,730 Cum
Extracting now0 Cum
Residual after phase2,730 Cum
Required heel210 Cum

How the extraction posts

  • Cryogenic liquid is pumped under its own vapour pressure into vacuum-jacketed dewars — losses are booked as boil-off.
  • Liquid routed through the vaporiser becomes gas, filled into cylinders by pressure differential up to the item max fill.
  • Each phase creates a Stock Entry (Material Transfer) from the bulk warehouse to Finished Goods.
  • Every receiving container gets an Asset Movement so the ERPNext asset location stays correct.
  • The source container stays on the shipment until the residual reaches the heel, then it is marked Emptied and returned to the carrier.