Container Tracker
Company: Airgas Industries Pvt Ltd
AS
Extraction Entry
Phase 1 · decant bulk gas into cylinders, dewars and silos
1 · Source container & purchase receipt
Opening in container
2,730 Cum
Max per extraction
3,990 Cum
Must remain (heel)
210 Cum
Safely extractable now
2,520 Cum
Helium ISO Container · Helium - 99.999%: keep 210 Cum inside so the vessel stays cold. Extraction happens in phases — each phase posts its own stock entry against .
2 · Receiving containers (0)
Scan the empty cylinders, dewars or silos receiving this phase.
44 empty containers are fit for filling today (2026-08-24). Hydro-test-overdue and damaged containers are hidden.
Extraction summary
Phase#1
Opening2,730 Cum
Extracting now0 Cum
Residual after phase2,730 Cum
Required heel210 Cum
How the extraction posts
- Cryogenic liquid is pumped under its own vapour pressure into vacuum-jacketed dewars — losses are booked as boil-off.
- Liquid routed through the vaporiser becomes gas, filled into cylinders by pressure differential up to the item max fill.
- Each phase creates a Stock Entry (Material Transfer) from the bulk warehouse to Finished Goods.
- Every receiving container gets an Asset Movement so the ERPNext asset location stays correct.
- The source container stays on the shipment until the residual reaches the heel, then it is marked Emptied and returned to the carrier.